Problem

During a balcony membrane inspection, our team noticed the railing anchors in some areas were missing. We took a closer look and quickly realized the railings were loose. The problem resulted from using the wrong anchors by the original construction company who installed these railings.

The CCR Solution

CCR was hired to remove the entire railing system, install new stainless steel anchors and secure railings to new non-corrosive anchors to all 364 balcony railings.